ViaWest Compark

  • 6MW UPS Capacity (18 MW Masterplan)
  • 3,000 tons of redundant cooling (6,000 Masterplan)
  • 140,000 square feet of raised floor
Continue reading

Enterprise TIER III Upgrade

  • Mechanical and electrical engineering for a  masterplan and infrastructure upgrade implemented with no downtime to the existing facility
  • Upgrades include a new chilled water distribution loop, new 2500 kw generator, replacement of existing generator, switchgear breaker retrofit
Continue reading

One Wilshire

  • Master planning and Engineering for infrastructure upgrade
  • 1,100 ton central condenser water system
  • New 10 MVA electrical Service
  • New 47 MVA network switch
Continue reading