![](https://swansonrink.com/wp-content/uploads/2018/12/36229597.jpg)
- Mechanical and electrical engineering for a masterplan and infrastructure upgrade implemented with no downtime to the existing facility
- Upgrades include a new chilled water distribution loop, new 2500 kw generator, replacement of existing generator, switchgear breaker retrofit