Mechanical and Electrical Engineers with Expertise in Terminals, BHS and Ramp Systems

Baggage Handling Systems design at over 60 airports, 75 years of experience in terminal design, jet bridge and fueling projects, and security checkpoint design at over 300 airports.

Aviation

Denver International Airport Great Hall

MEP, low-voltage, and fire protection design for the multi-phased, $1.3B modernization of the Great Hall at DEN. The program enhances capacity, safety, and the overall passenger experience with new check-in and ticketing areas, upgraded level-6 security checkpoints, a revitalized central terminal and Concourse A walkway, expanded post-security concessions, and improved curbside operations.

Harry Reid International Airport Terminal 1 & 2 Modernization Planning

Planning design services for the modernization and upgrades to T1 and T2 (formerly T3) buildings, including BHS design services. The scope of services includes BHS engineering for check-in, bag screening, outbound bag makeup, and potentially inbound bag subsystems, for each T1 and T2. Swanson Rink is also contributing to the development of the Airport Design Manual (ADM) for use in future projects at LAS.

Los Angeles International Airport MSC South

Design of the baggage handling system, passenger boarding bridges, fueling systems, and ramp operations for an 8-gate, 150,000-sf new terminal. Scope included a new outbound baggage room, ADG-III capable boarding bridges, PCA and GPU services, potable water systems, and comprehensive ramp planning for aircraft and ground support equipment. The concourse was designed using off-site construction and to accommodate future adaptability.

Hartfield Jackson Atlanta International Airport Checked Baggage Inspection System

Baggage handling system design for Concourse E Checked Baggage Inspection System (CBIS) recapitalization, including outbound BHS optimization, system phasing, BIM coordination, and supporting MEP engineering.

Sky Harbor Phoenix International Airport Baggage Handling Systems Commissioning

QA/QC, peer review, construction administration, and commissioning for the Terminal 3 Modernization inbound and outbound baggage handling systems. Additional engineering included BHS and ground service equipment planning for the Terminal 3 North Concourse 2 and Connector, addressing system capacity, impacts on existing CBIS infrastructure, spatial needs, and building system requirements.

Denver International Airport Concourse A West Expansion

Mechanical and plumbing engineering for 441,000 sf of new concourse space, including two new subcores, two international nodes with provisions for two future nodes, 11 gates, 15 holdrooms, and a full basement.

Harry Reid International Airport Terminal 1 & 3 BHS Upgrades

Completed a series of Baggage Handling System upgrades at Harry Reid International Airport. The 3-year, $71 million project delivered significant improvements across both terminals. Engineering design for Terminal 1 included Inbound and Outbound BHS improvements for Nodes 4 and 5a including upgrades to eight carousels, replacement of eight additional carousels, conveyor replacements and the installation of new carousel columns featuring LED screens. In Terminal 3, the work centered on modernizing BHS control systems through computer hardware and software upgrades.

Colorado Springs Airport Oversize Baggage Handling Systems Deisgn

Load and capacity analysis of oversized baggage systems to support near- and long-term passenger growth, followed by design upgrades to automate transport between screening systems and outbound sortation carousels. The improvements reduced manual handling and enhanced worker safety. Additional scope included an automated bypass line from Zone 4 to Zone 3 and MEP, fire alarm, fire protection, and telecom design within the BHS area.

San Diego International Airport Terminal 2 East

Planning and design for reconfiguration and upgrades to the Terminal 2 East baggage handling system through the IFC phase. Following a program pause and restart, the work advanced integration of disparate systems and included development of an operational network security framework for the airport to use with stakeholders across BHS subsystems.

Denver International Airport Concourse B West Expansion

Mechanical and plumbing engineering for a 90,000-sf expansion featuring four new domestic gates, three levels (apron, concourse, and partial basement), and four holdrooms. The project also included 45,000 square yards of apron paving with deicing system design.

Harry Reid International Airport Terminal 1 CBIS Recapitalization

Engineering design services for existing obsolete Explosive Detection Systems (EDS) equipment in Terminal 1 under the TSA EBSP Recapitalization Program. The work for this project included the replacement of EDS at Nodes 1, 3, 4, and 5/5a with a focus on the optimization of baggage handling system performance.

Spokane International Airport Terminal Renovation and Expansion

Baggage handling system design, passenger boarding bridge design, and apron planning for a terminal-wide program to unify the airport, improving passenger flow, and supporting future growth. Projects included the Central Bag Claim Hall, A/B and C security checkpoints, Terminal C Expansion, Concourse C West holdroom, curbside canopy, and associated apron/bridge systems. Earlier design work included simulations of existing and proposed security screening checkpoint layouts in Terminals A,B and C to investigate the value of possible improvements in overall check-in operations, particularly focusing on the TSA processes.

Bozeman International Airport Terminal Expansion

Engineering design for the terminal expansion, including automated inbound BHS, second-level ticketing, system load analysis, layout development, BHS controls and power distribution, and integration of IT, fire alarm, and security.