16 Chestnut

  • LEED Platinum
  • 655,000 square feet
  • 14 levels office space
  • 6 levels of parking garage

Automaker Data Center

  • Greenfield
  • 19,000 sf
  • 1.9 MW
  • LEED Certified

Aventura Mall

  • 255,000 square feet
  • 3 story addition
  • Reconfiguration and renovation of 37,000 square feet of existing space

Beverly Center Renovation

  • Engineering Design for the rebrand of the mall
  • $500 Million Re-Imagination
  • Iconic Fashion Destination

Chesapeake Data Center

  • 55,000 sf with 12,000 sf raised floor
  • MEP Engineer direct to Owner
  • Uptime Institute Tier III Construction Certified

Clinton National Airport

  • Concourse Renovation Design

Confidential Data Center

  • Prime consultant for new 24 MW data center

DaVita World Headquarters

  • LEED Gold
  • Overhead air distribution system with floor by floor air handlers
  • Chilled water central cooling plant and hot water central heating plant

Denver International Airport

  • Great Hall
  • Concourses A and C PCA Plants Re-Life
  • Gate Apron Rehabilitation Fueling Design
  • Concourse A East Jet Fuel Distribution Relocation
  • Concourse A West Expansion
  • Southwest Airlines BHS Analysis

Enterprise TIER III Upgrade

  • Mechanical and electrical engineering for a  masterplan and infrastructure upgrade implemented with no downtime to the existing facility
  • Upgrades include a new chilled water distribution loop, new 2500 kw generator, replacement of existing generator, switchgear breaker retrofit

Fortune 100 Data Center

  • Mechanical / Electrical Engineering
  • 113,000 sf
  • Prime Consultant

Gerald Ford International Airport

  • Gateway Transformation Project

Hollywood Burbank Airport

  • BHS Recapitalization

International Marketplace

  • 3 level outdoor retail center
  • Additional Engineering design for 2 Michael Mina Restaurants
  • 225,000 square feet of retail shops

Kansas City International Airport

  • Baggage Screening Expansion, Terminal C

Las Vegas McCarran International Airport

  • Terminal 1 Recapitalization
  • CBIS Operational Efficiency Improvements Study

Los Angeles International Airport

  • TBIT Baggage Optimization Program
  • Southwest Airlines Terminal 1.5 Development Project
  • Terminal 9 Planning
  • Terminal Cores and APM Interface Project

Mall of San Juan

  • Predominant shopping venue in Puerto Rico
  • First upscale mall on the island
  • 412,000 square feet of in-line tenant space

Newark International Airport Ticket Counter

  • Checkpoint Simulations

Oakland International Airport

  • FIS Simulations

One Wilshire

  • Master planning and Engineering for infrastructure upgrade
  • 1,100 ton central condenser water system
  • New 10 MVA electrical Service
  • New 47 MVA network switch

Restoration Hardware

  • Anchor store to iconic Cherry Creek Mall
  • Rooftop restaurant and patio

San Francisco International Airport

  • Terminal CBIS Modifications
  • Terminal 1 Boarding Area B Reconstruction

Scottsdale Fashion Square

  • Design for new luxury wing
  • 5 new stores, 9 remodeled shops

Spokane International Airport

  • Terminal Expansion and Renovation BHS
  • Terminal Expansion and Renovation Simulations
  • EDS Recapitalization Program

STK Restaurant

  • 7,200 square feet
  • Branch off of the popular restaurant chain STK

TSA

  • Passenger Screening Program (PSP) TEDS

ViaWest Chaska

  • Renovation
  • Modular Mechanical Skids
  • 7200 kW Capacity
  • 70,000 sf

ViaWest Compark

  • 6MW UPS Capacity (18 MW Masterplan)
  • 3,000 tons of redundant cooling (6,000 Masterplan)
  • 140,000 square feet of raised floor

Zcolo

  • Mechanical and electrical engineering for tenant buildouts in Denver and LA

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt

Start typing and press Enter to search