Aventura Mall 255,000 square feet 3 story addition Reconfiguration and renovation of 37,000 square feet of existing space
Beverly Center Renovation Engineering Design for the rebrand of the mall $500 Million Re-Imagination Iconic Fashion Destination
Chesapeake Data Center 55,000 sf with 12,000 sf raised floor MEP Engineer direct to Owner Uptime Institute Tier III Construction Certified
DaVita World Headquarters LEED Gold Overhead air distribution system with floor by floor air handlers Chilled water central cooling plant and hot water central heating plant
Denver International Airport Great Hall Concourses A and C PCA Plants Re-Life Gate Apron Rehabilitation Fueling Design Concourse A East Jet Fuel Distribution Relocation Concourse A West Expansion Southwest Airlines BHS Analysis
Enterprise TIER III Upgrade Mechanical and electrical engineering for a masterplan and infrastructure upgrade implemented with no downtime to the existing facility Upgrades include a new chilled water distribution loop, new 2500 kw generator, replacement of existing generator, switchgear breaker retrofit
International Marketplace 3 level outdoor retail center Additional Engineering design for 2 Michael Mina Restaurants 225,000 square feet of retail shops
Las Vegas McCarran International Airport Terminal 1 Recapitalization CBIS Operational Efficiency Improvements Study
Los Angeles International Airport TBIT Baggage Optimization Program Southwest Airlines Terminal 1.5 Development Project Terminal 9 Planning Terminal Cores and APM Interface Project
Mall of San Juan Predominant shopping venue in Puerto Rico First upscale mall on the island 412,000 square feet of in-line tenant space
One Wilshire Master planning and Engineering for infrastructure upgrade 1,100 ton central condenser water system New 10 MVA electrical Service New 47 MVA network switch
San Francisco International Airport Terminal CBIS Modifications Terminal 1 Boarding Area B Reconstruction
Spokane International Airport Terminal Expansion and Renovation BHS Terminal Expansion and Renovation Simulations EDS Recapitalization Program
ViaWest Compark 6MW UPS Capacity (18 MW Masterplan) 3,000 tons of redundant cooling (6,000 Masterplan) 140,000 square feet of raised floor